Golden standard for the Slussen Bridge

The pavement system for a new bridge includes both asphalt andwaterproofing. This makes major demands of quality awarenessand the ability to coordinate different technologies.

Więcej o Golden standard for the Slussen Bridge

Punt Val Mulinaun, Switzerland

High-quality waterproofing of a bridge is generally carried out using mastic asphalt. This is all the more true if there are increased stresses due to climatic conditions or traffic loads. One example is the Punt-Val-Mulinaun arch bridge on the Oberalpstrasse H19 in Graubünden, Switzerland.

Więcej o Punt Val Mulinaun, Switzerland

Norway's new super bridge

The Hålogaland bridge is located 300 km north of the Arctic Circle, and crosses a fjord by the city of Narvik in northern Norway.

Więcej o Norway's new super bridge

The high coast bridge in Ångermanland, Sweden

The High Coast Bridge is one of the biggest suspension bridges in the world. The geographical location places great demands on the structure's insulation and surfacing systems.

Więcej o The high coast bridge in Ångermanland, Sweden

The Sundsvall Bridge, Sweden

The newly constructed section of highway E4 trough Sundsvall is a major project with a price tag of roughly SEK 4.6 billion. The construction work began in spring 2011 and was completed in 2014.

Więcej o The Sundsvall Bridge, Sweden

Kontakty

Carsten Meyer

Sales Manager, Bitumen Western Europe

phone number +32 2 709 68 35
mobile number +49 172 450 33 08
email number Send an email

Grzegorz Sochanski

General Manager

phone number +48-91-4623121
email number Send an email

Ilona Bandosz

Sales Assistant

phone number +48-91-4623121
email number Send an email